Chimney repairs in Cosham — repointing, lead flashing, stack rebuilds and pot replacement. Cosham's 1930s semis have chimney stacks that are now 85–90 years old.
Tell us the job in 30 seconds. No pushy sales, no call-out fee.
📞 Call Now: 0239 307 1334Lead flashing failure, ridge mortar deterioration and pot haunching failure are the most common chimney calls from Cosham. We assess the full stack on every job not just the reported failure point.
Repointing is appropriate where brick faces are intact and only mortar joints have failed. Rebuilding is required where bricks have spalled, the stack has leaned or structural movement is present.
Correct lead code for the exposure position is specified on every Cosham chimney job. Heavier code on harbour-facing and seafront elevations. The additional cost is modest against the extended replacement interval.
Cosham's 1930s semis have chimney stacks that are now 85–90 years old. The original lime mortar has generally failed and the correct replacement is a breathable lime-based mix — OPC cement on 1930s soft brick will cause spalling within 10–15 years. The most common calls we receive for chimney work in Cosham are lead flashing failure, mortar joint deterioration and pot haunching failure. We assess the full stack on every chimney job — treating only the visible failure while leaving secondary damage unaddressed is a false economy.
Repointing is appropriate where the brick faces are intact and only the mortar joints have failed. Rebuilding is required where bricks have spalled, the stack has leaned or water has penetrated the core. We assess this honestly on survey — a stack that needs rebuilding will not be quoted as a repointing job.
For Cosham standard positions we specify code 4. For exposed north and west elevations facing the A27 corridor we specify code 5. We specify the correct lead code for the exposure position — heavier code on coastal and harbour-facing elevations. The additional cost of heavier lead is modest against the longer replacement interval it provides.
| Service | Cost Guide | Notes |
|---|---|---|
| Chimney repointing | £250–£650 | Full extent assessed on survey |
| Lead flashing replacement | £400–£800 | Correct code for exposure |
| Pot and haunching | £150–£350 | Replacement pot included |
| Partial stack rebuild | £800–£1,800 | Up to 1 metre |
| Full stack rebuild | £1,500–£3,500 | Includes scaffold |
"1930s semi on Drayton Lane — re-roof the second time for this property. Portsmouth Roofing was honest that the tiles were past repair and specified the right modern equivalent. No pressure, good advice."
"Nail sickness on our post-war Cosham property. Both main slopes assessed and re-fixed with stainless. Explained exactly what nail sickness means and what to watch for."
"Flat roof on our 1970s rear extension — GRP in a day. They matched the upstand height to the existing brickwork exactly. Neat finish."
Chimney problems show as damp on the ceiling or wall around the chimney breast, crumbling mortar visible on the stack, or debris in the fireplace.
When it is not the answer: If only the mortar joints have failed, repointing is the answer rather than a full rebuild Read the full guide.
Portsdown Hill shelter reduces salt slightly, but 1930s concrete tiles here are shedding surface aggregate at 85–90 years old. Cosham's 1930s semis have generous simple roofs with good access, though mature avenue trees complicate scaffold and skip placement. It is why we specify marine-grade fixings and correct lead codes as standard on Cosham roofs — the coastal environment punishes anything less.
We assess the stack, flashing, flaunching and pots, and identify whether repointing, re-flashing or rebuilding is needed.
An itemised quote specifying lime or cement mortar per the stack's era and coastal lead codes.
We book the work and arrange scaffold, coordinating with a neighbour on shared party-wall stacks.
We carry out the repair — repointing, re-flashing in code 5–6 lead, re-flaunching or rebuilding as specified.
Scaffold struck, site cleared, and your workmanship guarantee issued.
| Job | Typical duration |
|---|---|
| Flashing renewal | Half to full day |
| Repointing (single face) | Half a day |
| Full stack repointing | 1–2 days |
| Re-flaunching and pots | 1 day |
| Partial rebuild | 2–3 days |
Lime mortar needs dry, frost-free conditions to cure — we plan chimney work around the forecast.
Stack work at ridge height always needs scaffold or an independent tower for safe working. Scaffold is specified for: all stack work at ridge height — always itemised in the quote and arranged by us - always itemised in your written quote, never a hidden extra, and we arrange it.
Cosham's 1930s semis have generous simple roofs with good access, though mature avenue trees complicate scaffold and skip placement. Pavement scaffold and skip permits go through Portsmouth City Council; allow a few working days on streets like High Street, Wootton Street, Spur Road where space is tight.
| Job | Typical range | Notes |
|---|---|---|
| Flashing renewal | £200–£600 | Code 5–6 lead |
| Repointing (single face) | £150–£400 | Lime or cement per era |
| Full stack repointing | £400–£800 | Scaffold-dependent |
| Re-flaunching | £150–£350 | Weather-shedding mix |
| Partial rebuild | £800–£2,500 | Per scope |
Worked example: A typical job on a property off High Street in Cosham, including access and waste removal, sits in the middle of the ranges above once surveyed.
No deposit on repairs under £500. Staged payments on re-roofs — nothing up front before materials are on site. All prices include VAT; written itemised quote before any work.
Covering PO6 and surrounding postcodes.
Chimney workmanship is guaranteed for 10 years; the repair uses era-correct mortar and code 5–6 lead for coastal durability.
If a fault appears in covered work, we come back and put it right. No quibbling, no re-charge.
Scaffold to the stack for a day or two and some mortar debris — we sheet the area, coordinate shared-stack access, and clear up fully. You do not need to stay home for external work - we just need power and access agreed in advance.
We avoid lime mortar work in frost or heavy rain; flashing and make-safe work can proceed year-round. Portsdown Hill shelter reduces salt slightly, but 1930s concrete tiles here are shedding surface aggregate at 85–90 years old.
Yes — Cosham is within our core service area. Call 0239 307 1334 for availability and free quote.
Yes — free, no-obligation survey and written quote before any work starts. No call-out fee.
Yes. NFRC registration, full public liability insurance and 10-year written guarantee on all work.
Most jobs are surveyed within 48 hours and started within 1–2 weeks. Emergency work is available same day — call 0239 307 1334.
Yes where appropriate — Victorian and Edwardian chimneys in Cosham require lime mortar, not OPC cement. Hard cement on soft brick causes spalling. We specify the correct mortar for the chimney age and construction.
Yes — shared party wall stacks are one of the most common chimney jobs in Cosham's terraced streets. We coordinate with both households and price the full stack, not just one side.
Yes — from £350. Capping an unused stack properly prevents water ingress and is significantly cheaper than repairing the damp damage that results from an open stack.
No call-out fees. No obligation. Local Portsmouth roofers covering this area.